Now that the floor in the garage is done, Jim is starting to get the driveway ready for its cement. There is a fairly significant drop-off on one side that will require a retaining wall before any more cement can be poured plus gravel, sand and re-bar must be positioned.
Meanwhile, the deck material was brought around to the back and the handy-d

andy scaffolding has been assembled so that the deck construction can begin.
And the area has been graveled ready to take the air conditioner when it arrives.