Built the front steps, one more coat of paint and they are ready to be installed.
Saturday, September 25, 2010
Parking pad - check
We have completed the parking pad in front of the garage. Kathleen can now wash her car on dry ground.


Built the front steps, one more coat of paint and they are ready to be installed.
Built the front steps, one more coat of paint and they are ready to be installed.
Sunday, August 29, 2010
Deckers
Deck being built.

We installed 3/4 inch spruce plywood over the 2x10 floor joists. The floor joists were installed with a 2 inch slope so that we obtained good drainage.



Applied roof membrane to the top of the plywood.
This method will make the area below totally waterproof. On top of this membrane we will install composite decking. Composite decking does not require refinishing which this south facing deck will require. I will install it on pressure treated sleepers which will allow space for water to run off the deck/roof.
We installed 3/4 inch spruce plywood over the 2x10 floor joists. The floor joists were installed with a 2 inch slope so that we obtained good drainage.
Applied roof membrane to the top of the plywood.
This method will make the area below totally waterproof. On top of this membrane we will install composite decking. Composite decking does not require refinishing which this south facing deck will require. I will install it on pressure treated sleepers which will allow space for water to run off the deck/roof.
Wednesday, August 18, 2010
In Case The Weather Ever Smartens Up...
Last Wednesday, the Air Conditioner was installed. Of course, we haven't had any warm weather to try it out and this will likely be the cause of an early winter. Oh well, maybe someday we'll hear it humming away.
Sunday, August 8, 2010
Nothing Like Three Projects On The Go At The Same Time
Meanwhile, the deck material was brought around to the back and the handy-d
And the area has been graveled ready to take the air conditioner when it arrives.
Concrete, Beautiful Concrete
Bright and early on Friday morning, John from Hay Lakes Concrete, started working on our garage floor. By the end of the day, he had finished with the floor, the pad that will hold the front steps and the three piles required for the back deck construction. THANK YOU, JOHN!!!
He toughed it out on a very hot day with swarms of mosquitoes to fight off. This should put a stop to all the sand getting tracked into the house.
Sunday, August 1, 2010
Jim-Bob, Is That You?
No more grave-like structure at the back of the house.
When he was done with that chore, Jim came in and began assembling the raised "bar" that will finish off the kitchen counter. Jim the drywall mudder must return before the unit is finished.
Monday, July 19, 2010
Pad for Front Step