Sunday, August 8, 2010

Concrete, Beautiful Concrete


Bright and early on Friday morning, John from Hay Lakes Concrete, started working on our garage floor. By the end of the day, he had finished with the floor, the pad that will hold the front steps and the three piles required for the back deck construction. THANK YOU, JOHN!!!

He toughed it out on a very hot day with swarms of mosquitoes to fight off. This should put a stop to all the sand getting tracked into the house.


Sunday, August 1, 2010

Jim-Bob, Is That You?

Yes, Jim is in his glory in the neighbours Bobcat. Finally, it is dry enough to fill in the hole holding the sonotubes (and corresponding big foot forms) that will form the foundation of the back deck.






No more grave-like structure at the back of the house.






When he was done with that chore, Jim came in and began assembling the raised "bar" that will finish off the kitchen counter. Jim the drywall mudder must return before the unit is finished.






Monday, July 19, 2010

Pad for Front Step

Finished the rebar for the garage pad, had to do a couple of changes that were recommended by my structural engineer neighbor. (Sylwester)
Then covered in the front of the front deck and dug out and prepared the area for the concrete pad which will go under the front steps.


Saturday, July 17, 2010

Garage Floor

Deck hole still has water so we are working on the garage floor, so far we have installed the styrofoam, the heating pipes and most of the rebar. I need to purchase more tie wire to complete the rebar.


Friday, July 16, 2010

Drinking water

Due to the on going rainy season, we had one of two things to do, build an ARC or install the Reverse Osmosis unit. I opted for the drinking water.

















Tuesday, July 13, 2010

We now have a swimming pool!

Almost had it ready for back filling, before we went to Cold Lake for a few days.(work) We now have a swimming pool with a very iffy diving board.

When it dries up we will continue.


Monday, July 5, 2010

Busy Busy -June

Sorry about no up dates. Have started working for others and have not had time to do a lot on the house.
The floor in the garage has been prepared for styrofoam, rebar, hot water piping and cement. Waiting for the water piping to arrive.



















We arranged for a contractor working in the area to dig a trench to put in the footing for the deck piles. He did that work two weeks ago, when we were away, however he was two feet short in length. So we had to wait until today when the machine was back in the area to get it done right.





















The weather has not helped, as we just received another rain and the hole is now full of water.





















Plan is to have the footings done and back filled ready to started the deck next week, weather depending.