Tuesday, August 30, 2016

WE'RE FLOORED!!






Apres the electrical inspection, the trench for the electrical cable was filled in and waiting for grass seed.





With the help of Craig Sprout, Jim has put laminate flooring down on the upper level of the shop

Sunday, August 7, 2016

It's Electrifying!!

 So... when we first built the house, we neglected to put a man door in the garage. Jim decided that, as he was working on connecting the house electricity to the shop, now would be a good time to remedy that. Cement will still have to be jack hammered out before the door is framed in. When done, we will be able to go in and out of this door rather than have the big garage doors always open.
 Electrical wires have been fed through the basement and garage to this point. It's worth noting that a 200 amp service was installed in the house to accommodate the shop when the house was first built.
 One of our very kind and generous neighbours lent Jim his small backhoe to dig the trench to the garage where the electrical cable will be buried.
The electrical box in the garage is awaiting more parts before the connections can be completed.