Saturday, October 23, 2010
Calculated Wrong
Made a mistake in number of boards required to complete the deck, they are now on order and deck will be completed soon.
Saturday, October 2, 2010
Preparing for winter.
Back filled next to the garage pad and relaid the side walk stones.

Front steps are now in place and the front door has been painted to match.

Back deck material has arrived but they failed to send along anchor clips. Deck top installation has been delayed until they arrive, Monday/Tuesday. We hope to finish the deck by the end of the week.
Front steps are now in place and the front door has been painted to match.
Back deck material has arrived but they failed to send along anchor clips. Deck top installation has been delayed until they arrive, Monday/Tuesday. We hope to finish the deck by the end of the week.
Saturday, September 25, 2010
Parking pad - check
Sunday, August 29, 2010
Deckers
Deck being built.

We installed 3/4 inch spruce plywood over the 2x10 floor joists. The floor joists were installed with a 2 inch slope so that we obtained good drainage.



Applied roof membrane to the top of the plywood.
This method will make the area below totally waterproof. On top of this membrane we will install composite decking. Composite decking does not require refinishing which this south facing deck will require. I will install it on pressure treated sleepers which will allow space for water to run off the deck/roof.
We installed 3/4 inch spruce plywood over the 2x10 floor joists. The floor joists were installed with a 2 inch slope so that we obtained good drainage.
Applied roof membrane to the top of the plywood.
This method will make the area below totally waterproof. On top of this membrane we will install composite decking. Composite decking does not require refinishing which this south facing deck will require. I will install it on pressure treated sleepers which will allow space for water to run off the deck/roof.
Wednesday, August 18, 2010
In Case The Weather Ever Smartens Up...
Last Wednesday, the Air Conditioner was installed. Of course, we haven't had any warm weather to try it out and this will likely be the cause of an early winter. Oh well, maybe someday we'll hear it humming away.
Sunday, August 8, 2010
Nothing Like Three Projects On The Go At The Same Time
Meanwhile, the deck material was brought around to the back and the handy-d
And the area has been graveled ready to take the air conditioner when it arrives.
Concrete, Beautiful Concrete
Bright and early on Friday morning, John from Hay Lakes Concrete, started working on our garage floor. By the end of the day, he had finished with the floor, the pad that will hold the front steps and the three piles required for the back deck construction. THANK YOU, JOHN!!!
He toughed it out on a very hot day with swarms of mosquitoes to fight off. This should put a stop to all the sand getting tracked into the house.
Subscribe to: