Well we are continuing with our project. Sorry about failing to post during the fall period.
We completed the framing of the walls in the basement.
We completed the wiring and installation of 27 pot lights.
Everything has been inspected and passed.
Over Xmas period completed the drywall boarding.
We are 75% complete on the first coat of drywall mud.
Hope to be to paint stage by 1 Feb.
Then it is install flooring and trim getting ready to start the spare bedroom and bathroom in March, just in time to move back out doors and the back yard landscaping and garden making.
I must be very wicked as there does not appear to be any rest soon.