Tuesday, August 30, 2016

WE'RE FLOORED!!






Apres the electrical inspection, the trench for the electrical cable was filled in and waiting for grass seed.





With the help of Craig Sprout, Jim has put laminate flooring down on the upper level of the shop

No comments:

Post a Comment