Monday, June 3, 2013
Lights, Flooring...OK That's As Far As We Got
After painting, Jim installed the light pictured, which will hang over the ping pong table. There is a complimentary one on the other side of the room which should end up being a sitting area. Sun Glasses must be worn at all times when in the basement as these ceiling fixtures, are in addition to the 29 pot lights. Thank heavens Jim divided them up amongst several switches. The flooring has been installed on the rec room and storage room. Now that summer has arrived, the bulk of our time will be spent outside but when it rains, the trim can be put on and then the junk moved out of the bedroom and bathroom areas so that work can begin on them.
Sunday, March 10, 2013
Basement primed
Spent Saturday priming the drywall.
This is a picture of the click flooring we will be putting down. They are 15.5" by 15.5" embossed finish tile, with a marble look to them. Aurora Eclipse "Quarried Stone" laminate tiles. I am going to try and put them down on the diamond. Wish me luck!
Winter fun!
We took a break one weekend and experienced the fun of toboganning again As you can see we had varying degree of success. We did better when we moved to the west side of the house. We really need help from the neighbourhood kids to pack the snow down so us old sluggers have an easier time of it.
Sunday, January 20, 2013
New Year Project
Well we are continuing with our project. Sorry about failing to post during the fall period.
We completed the framing of the walls in the basement.
We completed the wiring and installation of 27 pot lights.
Everything has been inspected and passed.
Over Xmas period completed the drywall boarding.
We are 75% complete on the first coat of drywall mud.
Hope to be to paint stage by 1 Feb.
Then it is install flooring and trim getting ready to start the spare bedroom and bathroom in March, just in time to move back out doors and the back yard landscaping and garden making.
I must be very wicked as there does not appear to be any rest soon.
Friday, August 17, 2012
The Path To Our Doorway Is Paved In Cement..Sort Of
A few weeks ago, Bob came to help top up the insulation in the attic. Settling has happened over the past couple of years...I know the feeling. Anyway, while he was here, he also got roped into spreading gravel along the front of the house as landscaping continues.
Since then the spreading has continued...again, I know the feeling. Now that the gravel has been spread all along the front of the house, it's time to create a sidewalk.
Jim has hauled out the old, yet reliable, cement mixer and using forms that we bought for a decorative sidewalk, the pouring has begun.
Tuesday, July 10, 2012
Jim's New Toy...
Tuesday, July 3, 2012
The Saga of Summer Landscaping Continues..
Subscribe to: