Went out yesterday and purchased the copper pipe and other materials to complete the water to the two main floor shower/tubs. Soldered everything together today and installed them. The system will be completed with PEX pipe (plastic) but it is recommended to do the shower/tub valve connections in copper and then transition to plastic below the floor. So, that is what we have done.

This is the tub in the guest bathroom area.














We receive another 80 sheets of drywall tomorrow to complete the basement and garage. So be prepared for more drywall steps to be added to this sad story.